Installing The Accessory Ring Core (Only For The Eu Type Models); Installing The Accessory Ring Core Supplied With The Electrical Box; Connecting The Power Switch Cable; Installing The Power Switch - JUKI PLC-2710V Instruction Manual

Table of Contents

Advertisement

2-7. Installing the accessory ring core (Only for the EU type models)

2-7-1. Installing the accessory ring core supplied with the electrical box

Refer to accessory manual for "SC-952 Installing the accessory ring core" supplied with the electrical box for
how to install the ring core.

2-8. Connecting the power switch cable

2-8-1. Installing the power switch

Electrical box
(EU type models:
Reactor box)
– 10 –
Fix power switch ❶ under the machine table with
wood screws ❷ .
Fix the cable with staples ❸ supplied with the ma-
chine as accessories in accordance with the forms of
use.

Advertisement

Table of Contents
loading

Table of Contents