❼
❸
❸
❹
❸
❺
❺
❺
❽
❾
❽
– 7 –
4) Connect the connector ❼ of the power cord that is
fixed to reactor base asm. ❸ to the connector of
reactor ❺ .
Be sure to insert the former fully into
the latter until the connector is locked.
5) Take out wood screws (ST4.2 x 25) from screw
bag ❹ . Secure reactor base asm. ❸ and reactor
❺ to the undersurface of sewing machine table
with the wood screws (at four locations).
Refer to the instruction figure shown in
the following step of procedure 11) for
the mounting positions of the reactor
cover and reactor base asm.
6) Secure power cord asm. ❽ coming from the elec-
trical box to reactor base asm. ❸ with bundled
wire clamp ❾ .
7) Connect the connector of power cord asm. ❽ to
connector of reactor ❺ .
8) Secure earth terminal of power cord asm. ❽ to
earth base with a screw.
Secure the earth terminal to the screw
with earth mark .