Pentair FLECK 2750 NXT Installer Manual page 90

Table of Contents

Advertisement

Installer manual Fleck 2750 NXT/NXT2 - Programming
Info
For metered valves, day override parameter would trigger a regeneration, only if the
volumetric control did not start a regeneration before calendar override period
elapsed.
Each volumetric regeneration happening reset the calendar override delay.
Calendar override is not visible in «Day of the week» mode.
1. Press and hold
programming mode.
2. Select the number of days or hours with
3. Press
to validate the selection and advance to the next
parameter.
ð Can be adjusted with 4H, 8H, 12H, 16H, 20H or from 1 to
99 days for timeclock regeneration and from OFF to
99 days for metered regeneration.
6.2.4.3
Regeneration time
Set the time for regeneration start.
Mandatory
Must be set when the regeneration flow programmed is timeclock, day of week mode,
volumetric delayed mode and any time a day override period or a remote delayed
regeneration is set !
1. Adjust the time with
2. Press
to validate the selection and advance to the next
parameter.
6.2.4.4
Hardness
Set the inlet water hardness in the unit defined on chapter Hardness units [
Info
This parameter is displayed only for softening valves when regeneration type selected
is softener metered delayed or immediate.
1. Adjust the hardness with
2. Press
to validate the selection and advance to the next
parameter.
6.2.4.5
Volume remaining
Display the remaining volume before the system's capacity is exhausted. This parameter can be
adjust if necessary, and will be reset to the programmed capacity after next regeneration.
90 / 170
and
simultaneously to enter user
and
.
,
and .
Without calendar override.
and
.
Override every 3 days.
Ref. MKT-IM-026 / C - 15.12.2020
Page 104].

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 2750 nxt2

Table of Contents