Pentair FLECK 2750 NXT Installer Manual page 108

Table of Contents

Advertisement

Installer manual Fleck 2750 NXT/NXT2 - Programming
• Tuesday;
• Wednesday;
• Thursday;
• Friday;
• Saturday.
1. Select the days for regeneration with
ð Multi-selection is possible;
ð Not selected days are marked by
are marked by
2. Press
to validate the selection and advance to the next
parameter.
6.2.5.22 Day override/time driven
Set the maximum number of days between two regenerations regardless from any other
regeneration triggering type that could be programmed.
Mandatory
For a timeclock valve, must be set as regeneration period in hours or days !
For metered valves, must be set in days !
Info
Not available if the regeneration type programmed is Day of week mode.
1. Adjust the number of days with
ð Can be adjusted with 4H, 8H, 12H, 16H, 20H or from 1 to
99 days for timeclock regeneration and from OFF to
99 days for metered regeneration;
2. Press
to validate the selection and advance to the next
parameter.
6.2.5.23 Regeneration time
Set the time for regeneration start.
Info
Depending on regeneration flow programmed, this parameter may be displayed or not.
108 / 170
,
and selected days
;
and
;
and ;
Calendar override
deactivated.
Override every 3 days.
Ref. MKT-IM-026 / C - 15.12.2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 2750 nxt2

Table of Contents