Pentair FLECK 2750 NXT Installer Manual page 82

Table of Contents

Advertisement

Installer manual Fleck 2750 NXT/NXT2 - Programming
6.1.6.3
Peak flow rate
Info
The controller registers the highest flow rate since the last regeneration.
6.1.6.4
Totalizer
Info
The controller registers the total volume of treated water that passes through the
meter since start-up (or last hard reset).
1. To reset, press and hold the buttons
5 seconds until the display shows zero.
6.1.6.5
Hours between last two regenerations
Info
Shows the number of hours between the last two regenerations, which indicates the
duration of the last service cycle.
6.1.6.6
Hours since last regeneration
Info
Shows the number of hours since the last regeneration, indicating the duration of the
current service cycle.
82 / 170
and
for
Ref. MKT-IM-026 / C - 15.12.2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 2750 nxt2

Table of Contents