TABLE OF CONTENTS IMPORTANT PLEASE READ: • The information, specifications and illustrations in this manual JOB SPECIFICATION SHEET ..........3 are based on the latest information available at the time of INSTALLATION ..............3 release. The manufacturer reserves the right to make changes START-UP INSTRUCTIONS ...........5 at any time without notice.
JOB SPECIFICATION SHEET D. Brine Tank Refill: _____________________________ Minutes E. Pause Time: _________________________________ Minutes Job Number: ___________________________________________________ F. Second Backwash: ____________________________ Minutes Model Number: _________________________________________________ 7. Drain Line Flow Control: Water Hardness: ________________________________________________ 8. Brine Line Flow Controller: ppm or gpg 9. Injector Size#: Capacity Per Unit: ______________________________________________ 10. Piston Type: Mineral Tank Size: _____________ Diameter: ________ Height: __________...
Page 4
INSTALLATION CONTINUED NOTE: All electrical connections must be connected according to local codes. Be certain the outlet is uninterrupted. By-Pass Valves Always provide for the installation of a by-pass valve if unit is not equipped with one. CAUTION W ater pressure is not to exceed 125 psi (8.6 bar), water temperature is not to exceed 110°F (43°C), and the unit cannot be subjected to freezing conditions. Installation Instructions 1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.
SYSTEM DISINFECTION Powerhead Assembly The system is not intended to be used for the treating water that is microbiologically unsafe or of unknown quality without adequate disinfection before or after the system. Disinfection of Water Softeners The materials of construction of the modern water softener will not support bacterial growth, nor will these materials contaminate a water supply.
3200 TIMER SETTING PROCEDURE How To Set Days On Which Water Conditioner Is To Regenerate (Figure 2) Rotate the skipper wheel until the number “1” is at the red pointer. Set the days that regeneration is to occur by sliding tabs on the skipper wheel outward to expose trip fingers. Each tab is one day.
approximately three hours and stop in the position shown in Timer Setting Procedure the drawing. How To Change The Length Of The Backwash Time 4. Even though it takes three hours for this center knob to The program wheel as shown in the drawing is in the service complete one revolution, the regeneration cycle of your unit position.
1-1/2 INCH STAINLESS STEEL METER ASSEMBLY IMPORTANT: For valves equipped with electromechanical Item No. QTY Part No. Description timers and stainless steel meters, refer to the Meter Dome and 1 ....1 ..62049-01 ..Service Kit, Union Orientation section. 1 inch & 1-1/2 inch Meter, Standard Range 1 ..62049-02 ..Service Kit, 1 inch &...
SEAL & SPACER TOOLS & REPLACEMENT Figure 5 Figure 6 6. Remove the seal first using the wire hook with the finger loop Tools Used in the Seal and Spacer Replacement (see “Figure 7”). Description Part No. Nut Driver ....12664 Socket Adapter ......16906 Socket 7/16-inch ......12665 Seal Hook .....
Page 38
SEAL & SPACER TOOLS & REPLACEMENT GENERAL SERVICE HINTS FOR METER CONTINUED CONTROL Problem: Softener delivers hard water Reason: Reserve capacity has been exceeded. Correction: Check salt dosage requirements and reset program wheel to provide additional reserve. Reason: Program wheel is not rotating with meter output. Correction: Pull cable out of meter cover and rotate manually.
TROUBLESHOOTING Problem Cause Correction Water conditioner fails to Electrical service to unit has been Assure permanent electrical service (check fuse, regenerate. interrupted plug, pull chain, or switch) Timer is defective. Replace timer. Power failure. Reset time of day. Hard water. By-pass valve is open.
WATER CONDITIONER FLOW DIAGRAMS 1 Service Position 4 Slow Rinse Position Hard water enters unit at valve inlet and flows down through the Hard water enters unit at valve inlet, flows up into injector mineral in the mineral tank. Conditioned water enters center housing and down through nozzle and throat, around the piston, tube through the bottom distributor, then flows up through the down through mineral, enters center tube through bottom...
SYSTEM #4 Typical Single Tank Installation with Optional Meter SYSTEM #5 INTERLOCK Typical Twin Tank Installation with Optional Meter Interlock and No Hard Water Bypass FLECK • 43 2850 Control Valve Service Manual...
SYSTEM #6 Twin Series Regeneration Installation with a Remote Meter SYSTEM #7 Twin Alternator Installation with a Remote Meter 44 • FLECK 2850 Control Valve Service Manual...