Pentair FLECK 2750 NXT Installer Manual page 53

Table of Contents

Advertisement

Inlet
Valve
Tank
Service
Total flow rate is split between three meters
5.
The third tank returns to standby as demand decreases and returns below the second trip
point.
Inlet
Valve
Tank
First trip
point
(primary
tank)
Total flow rate is split between two meters
6.
Tanks return to standby due to decreased total flow rate and programmed trip points. The
tank with the most remaining volume will be the first to go into standby.
Ref. MKT-IM-026 / C - 15.12.2020
Service
Service
Service
Stand-By
Installer manual Fleck 2750 NXT/NXT2 - Installation
Outlet
Check valve
Stand-By
Meter
Outlet
Check valve
Stand-By
Meter
53 / 170

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 2750 nxt2

Table of Contents