Fig. 69: Wire routing for switchgear
without wiring duct
Recommended wire routing for secondary equipment: from the side, from the rear and from above. For access from below, use screened cable plugs.
Wire routing for panel blocks possible through wiring duct. For extendable switchgear, wire routing through the wiring duct is recommended.
500-8067.9 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * Revision 03
13.3
Connecting secondary equipment
Fig. 68: 8DJH: Operating mechanism box of ring-main panel
The terminal strips of the secondary equipment supplied are assigned to the associated
operating mechanisms/feeders. For external connection you will require the circuit
diagrams supplied.
a
s
d
f
Fig. 70: Wire routing for switchgear
a
with wiring duct
Installation
Wiring duct
Ready-for-service indicator
Terminal strip
Customer-side wiring
95