Siemens 8DJH Series Installation And Operating Instructions Manual page 92

Medium-voltage switchgear
Table of Contents

Advertisement

Installation
Fig. 65: Inserting the front floor cover and the rubber sleeves (switchgear up to 21 kA)
a
Rubber sleeves for cable entry (diameter 70 mm)
s
If required, use rubber sleeves for control cables (diameter 56 mm) /
screened cable plugs
92
Remove the two thread-ridging screws M6 of the cable compartment cover
Lift the cable compartment cover and remove it to the front..
Remove the cross member
To do this, undo the 4 bolt-and-washer assemblies M8.
d
Remove the front plate
To do this, undo the 6 bolt-and-washer assemblies M8.
Take the front floor cover out.
Lead the high-voltage cables into the cable compartment.
Push rubber sleeves over the high-voltage cables.
Push the high-voltage cables with the rubber sleeves into the cutout provided for this
purpose in the front floor cover.
Refit the front floor cover observing that the floor cover fits correctly into the slot of
the rubber sleeve.
Bolt the front floor cover to the foundation together with the switchgear frame using
three bolts.
Mount the cross member, the front plate of the pressure absorber and the cable
compartment cover.
Revision 03 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * 500-8067.9
s
.
of the pressure absorber.
d
Front floor cover
a
.