Installation
Cable installation in
switchgear with pressure
absorber up to 16 kA
90
Fig. 62: Switchgear with pressure absorber up to 16 kA
Remove the two thread-ridging screws M6 of the cable compartment cover
Lift the cable compartment cover and remove it to the front..
Remove the cross member
assemblies M8.
Take the front floor cover out.
Lead the high-voltage cables into the cable compartment.
Push rubber sleeves over the high-voltage cables.
Push the high-voltage cables with the rubber sleeves into the cutouts provided for
this purpose in the floor cover.
Refit the floor cover, observing that the floor cover is correctly seated in the slots of
the rubber sleeves.
Bolt the front floor cover to the foundation together with the switchgear frame using
one bolt.
Revision 03 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * 500-8067.9
a
s
s
. To do this, undo the 4 bolt-and-washer
Cable compartment cover
Cross member
a
.