96 Redundant system rollback
Approximate time estimate = 10 minutes
Stop network elements on secondary servers in the following order:
1. Secondary UFTP
2. Secondary IP Client Manager
3. Secondary Provisioning Manager
4. Secondary Session Manager
Procedure 79
Stopping secondary network elements
Step
1
2
3
4
5
6
Set up database replication
Set up database replication on the primary System Manager Server.
Approximate time estimate = 15 minutes
Procedure 80
Setting up database replication
Step
1
2
3
Copyright © 2007, Nortel Networks
.
Action
Log on to the Management Console as admin.
Expand the Network Elements folder.
Expand the folder for the type of network element you want to stop.
Expand the folder for the specific network element you want to stop.
Click the NE Maintenance node.
Select an instance in the ACTIVE state and click the Stop button.
When the instance stops, the state changes to OFFLINE.
Action
Log on to the primary System Manager Server as nortel.
Change the directory:
cd /var/mcp/exlab
Edit the installation properties file installprops.txt as follows:
Nortel Multimedia Communication Server 5100
MCS Upgrades—Maintenance Releases
NN42020-303 01.08 Standard
Release 4.0 10 August 2007