Redundant system rollback
Use the procedures in this section to rollback a redundant Medium System
(eight servers) to the previous load.
Overview
Each of the following sections describes a required procedure.
These procedures must be performed in the order given.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Copyright © 2007, Nortel Networks
.
Note: The database backup from the previous load must be available
on the primary Database Server.
"Stop the Server Monitor" (page 86)
"Stop the Database Monitor" (page 86)
"Drop database replication" (page 87)
"Stop primary network elements" (page 88)
"Stop the primary System Manager" (page 89)
"Extract the previous primary load" (page 89)
"Restore the primary load" (page 90)
"Restore the primary database" (page 91)
"Restore the primary System Manager" (page 91)
"Stop the secondary System Manager" (page 66)
"Restore, deploy, and start primary network elements" (page 92)
"Stop secondary network elements" (page 95)
"Set up database replication" (page 96)
"Resynchronize the database" (page 97)
"Reconfigure SNMP" (page 97)