Chapter 6
Performing post-migration tasks
In this section
"Disconnecting the tape drive" (page 85)
"Verifying CallPilot system configuration" (page 85)
"Verifying CallPilot network database" (page 88)
"Replacing Meridian Mail with CallPilot" (page 93)
"Running Meridian Mail and CallPilot at the same time" (page 94)
Disconnecting the tape drive
If you used an external tape drive to perform the migration, you must
disconnect the tape drive at the end of the migration process. Do not
disconnect the tape drive until you are certain that the migration is
successful.
If the server has an internal tape drive, do not remove it.
To disconnect the tape drive
Power down the CallPilot server, and then unplug and disconnect the tape
drive.
Verifying CallPilot system configuration
Introduction
During the migration to CallPilot, some fields are converted to default
values, because the information cannot be migrated from Meridian Mail to
CallPilot, or the information did not exist in Meridian Mail. Refer to
that can or cannot be migrated" (page
Copyright © 2007, Nortel Networks
.
Nortel CallPilot
Meridian Mail to CallPilot Migration Utility Guide
NN44200-502 01.02 Standard
5.0 17 April 2007
ATTENTION
20).
85
"Data