26 Chapter 3 Planning a Meridian Mail data collection
Migration activity
Message and Contact Center prompt collection
Selective migration for each customer group
Data collection
Message and Contact Center prompt collection
Schedule the migration for one ore more maintenance periods. A
maintenance period is the time during which the Meridian Mail system can
be taken out of service.
the total migration time is
estimated to take
less than a maintenance period
more than a maintenance period
Ensure that a schedule of the migration process is announced to the users.
Collecting data in a single session
Overview
This section provides recommendations for collecting data for small and
large systems in one session.
Collecting data for a small system
Small systems are migrated by volume using full data collection on two
tapes.
Tape number
1
2
Copyright © 2007, Nortel Networks
.
Data
•
system data — includes system and customer
profiles, networking data, RPLs and COSs
•
user data
•
personal distribution lists
•
system distribution lists
•
voice segments and fax items
voice messages and Contact Center prompts for each
volume
Nortel CallPilot
Meridian Mail to CallPilot Migration Utility Guide
NN44200-502 01.02 Standard
5.0 17 April 2007
500 users
2 minutes for each hour of
voice storage
15 minutes
2 minutes for each hour of
voice storage
THEN
you can perform the migration in one
session.
you must perform the migration in several
sessions.
3500 users
80 minutes