Transceiver Unit - Furuno FAR-3210 Installation Manual

Chart radar
Hide thumbs Also See for FAR-3210:
Table of Contents

Advertisement

11. Connect the shield
wires of the antenna
cable and serial cable
for processor unit to
each grounding point.
12. Reattach the cable clamp assembly.
13. Remove the connector cover for the power cable (2 places).
14. Fabricate the power cable (DPYC-2.5) as shown below.
15. Pull up the plastic cover and connect the power cable.
16. Remount the connector cover for the power cable.
17. Reattach the cover of the power supply unit.
2.8

Transceiver Unit

The TR-DOWN radar requires the transceiver unit as follows:
• Transceiver Unit RTR-108 for X-band radar
• Transceiver Unit RTR-109 for S-band radar
2.8.1
How to fabricate the cables
For how to connect the LAN modular plug, see "LAN cable" on page 2-5. For how to
connect the WAGO connector, see "WAGO connector" on page 2-5.
Connector cover of power cable
Armor
Vinyl tape
Sheath (Clamp here.)
Sheath (Clamp here.)
Grounding point (for antenna cable)
Grounding point (for antenna cable)
Grounding point
Grounding point
(for serial cable for processor unit)
(for serial cable for processor unit)
Plastic cover
FV2-M4
25
35
30
2. WIRING
2-45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents