Monitor Unit - Furuno FAR-3210 Installation Manual

Chart radar
Hide thumbs Also See for FAR-3210:
Table of Contents

Advertisement

1. INSTALLATION
6. Using a hex bolt (M625), nut (M6), spring washer (M6) and flat washer (M6), es-
tablish the ground system on the mounting platform as shown in the following fig-
ure. The location must be within 340 mm of the ground terminal on the Antenna
Unit. Connect the ground wire (RW-4747, 340 mm, supplied) between the ground-
ing point and ground terminal on the Antenna Unit. Coat the hardware of the
ground system with the supplied adhesive.
Antenna chassis side
Ground terminal
Mounting platform side
Arrange ground terminal as close as possible to Antenna Unit. There are two
methods to connect ground wire for mounting platform side.
Method 1
Ground wire
Ground wire
Adhesive
Adhesive
1.3

Monitor Unit

See the operator's manual for MU-190 (OMC-44670), MU-231 (OMC-44690) or MU-
270W (OMC-44930) for the installation procedure. Keep in mind the following points
when selecting a location.
• Locate the monitor unit where no framing is installed immediately in front of the
monitor.
• Locate the monitor where the display is easily visible in all ambient lighting condi-
tions.
1-12
Hex bolt
Mounting Platform
Mounting Platform
Flat washer
Spring washer
Hex nut
Bridge window
Viewing point
Viewing point
Ground wire
Method 2
Flat washer
Ground wire
Ground wire
Welding
Viewing point
Viewing point
Adhesive
Antenna Chassis
Antenna Chassis
Adhesive
Adhesive
Hex bolt
Spring washer
Flat washer
Hex bolt
Mounting Platform
Mounting Platform
Bridge
window

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents