1.5

Power Supply Unit

1.5.1
Installation considerations
The Power Supply Unit can be mounted on a bulkhead or deck. Keep in mind the fol-
lowing points when selecting a location.
• Locate the unit away from heat sources because of heat that can build up inside the
cabinet.
• Select a location where the vibration is minimal.
• Locate the equipment away from places subject to water splash and rain.
• Make the service clearance of 100 mm in front of the vent hole (front and rear sides).
PSU-014
PSU-016
PSU-015
PSU-018
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• Connect the ground wire between the earth terminal on the chassis and the ship's
earth.
PSU-014/PSU-016
• A magnetic compass will be affected if the unit is placed too close to the magnetic
compass. Observe the compass safe distances on page ii to prevent disturbance to
the compass.
Front
(Cable entrance side)
Ground wire
(IV-8sq, local supply)
1. INSTALLATION
: vent hole
Rear
PSU-015/PSU-018
Ground terminal
Ground terminal
Crimp-on lug FV2-M3 BLU
Crimp-on lug FV2-M3 BLU
in CP03-35301
in CP03-35301