Commissioning the heating system
Heating water buffer cylinder:
■
–
Select buffer temperature sensor (set the number
of buffer temperature sensors)
–
Select buffer type (selecting the type of heating
water buffer cylinder)
Set heating water buffer cylinder minimum temper-
–
ature (top)
Set buffer charging up to buffer temperature sen-
–
sor
–
Set buffer charging up to buffer temperature
■
Additional boiler:
–
Select additional boiler
Set buffer charging up to buffer temperature sen-
–
sor
–
Set buffer charging up to buffer temperature
–
Select parallel mode
■
Select connection for heating circuits 1 to 4
■
Select DHW connection
Setting the language
Shortly after switching the power on, the display shows
"Select language".
Press the following keys:
1.
/
For the required language.
|
~
Loading the standard setting
Note
When loading the standard setting, the control unit is
reset to factory settings. A complete commissioning
sequence must then be carried out.
Setting the date
Press the following keys:
1.
/
For the required date.
|
~
Setting the time
Press the following keys:
1.
/
For the required time.
|
~
Commissioning, inspection, maintenance
(cont.)
Select DHW circulation on boiler
■
■
Select solar connection
For solar and DHW "On the boiler":
–
Select solar diverter valve
–
Set solar DHW maximum temperature
Set solar collector maximum temperature
–
Select set DHW temperature reheating suppres-
–
sion
–
Nominal flow rate collector circuit
■
Select minimum system temperature
–
Set minimum system temperature
■
Change heating circuit designations
Check diagnostics (sensors)
■
Check outputs (actuators)
■
■
Calibrate O
probe (Lambda probe)
2
■
Fill vacuum module
■
Terminate the commissioning sequence (commis-
sioning completed)
2.
To confirm.
d
Press the following keys:
1.
/
For "Yes" or" No".
|
~
2.
To confirm.
d
2.
To confirm.
d
2.
To confirm.
d
63