Viessmann VITOLIGNO 300-C Installation And Service Instructions Manual page 40

Pellet boiler 60 to 70 kw
Table of Contents

Advertisement

Installation sequence
Making the connections on the heating water side
Overview of connections
Fig. 34
Boiler return
A
Boiler flow
B
Safety assembly connection
C
Safety heat exchanger, DHW drain pipe
D
E
Safety heat exchanger, cold water inlet
Connecting the thermally activated safety valve
Connections
Safety heat exchanger, DHW drain
D
pipe
E
Safety heat exchanger, cold water
inlet
!
Please note
Exceeding the torque during installation causes
damage to the sensor well.
Do not exceed the max. torque of 30 Nm.
40
Note
A
Route water pipes so that all casing panels are acces-
B
sible and can be removed for maintenance.
C
Connections
Boiler return
A
D
E
Boiler flow
B
C
Safety assembly connection
(male thread)
!
Please note
Incorrect installation of thermally activated
R
1/2
safety equipment can lead to injury and material
damage.
R
1/2
Any contamination of the system must be
removed prior to installation. Contamination
can accumulate on the valve seat and result in
a fault.
Install components in the correct sequence.
See diagram.
The thermally activated safety valve can be
installed in any position.
The arrow on the valve body indicates the
direction of flow.
The outlet is open to the atmosphere and must
not be closed off.
After installation, check that the valve is work-
ing correctly.
Do not loosen or tighten the nut on the red
operating button on the safety valve.
DN
40
PN
6
DN
40
PN
6
G
1
½

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl3c

Table of Contents