Concluding Steps; Replacing The Ufm; Preliminary Steps - Fujitsu PRIMERGY TX150 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX150 S8:
Table of Contents

Advertisement

Figure 270: Removing the UFM (B)
Ê The UFM spacer remains on the system board.

14.3.2.3 Concluding steps

"Reassembling" on page 64
Ê
"Connecting the server to the mains" on page 74
Ê
"Switching on the server" on page 75
Ê
"Enabling BitLocker functionality" on page 100
Ê

14.3.3 Replacing the UFM

Upgrade and Repair Unit
(URU)
Tools: – Phillips PH1 / (+) No. 1 screw driver
– combination pliers and flat nose pliers

14.3.3.1 Preliminary steps

"Disabling or suspending BitLocker functionality" on page 79
Ê
"Disabling SVOM boot watchdog functionality" on page 80
Ê
"Locating the defective server" on page 47
Ê
"Shutting down the server" on page 50
Ê
"Disconnecting the server from the mains" on page 50
Ê
"Getting access to the component" on page 51
Ê
TX150 S8 / TX200 S7
Upgrade and Maintenance Manual
System board and components
Hardware: 10 minutes
Software: 5 minutes
357

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx200 s7

Table of Contents