Lenovo ThinkSystem SR670 V2 Maintenance Manual page 296

Table of Contents

Advertisement

Step 9.
Rotate the L2A counterclockwise.
a.
Hold the right end of the radiator which is attached with the tubes, and hold the cold plate
assembly lifting handle.
b.
Rotate the L2A counterclockwise so that the left end of the radiator is standing on a flat
surface, and the cold plate assembly lifting handle is facing your left side.
Figure 222. Rotating the L2A counterclockwise
Step 10. Turn the L2A upside down.
a.
Keep the left end of the radiator standing on the flat surface, and hold the cold plate
assembly lifting handle.
b.
Move your hand to hold the bottom edge of the radiator, then turn the L2A upside down so
that the upper side of the radiator and cold plate assembly lifting handle are facing down.
Figure 223. Turning the L2A upside down
Step 11. Place the L2A on a clean flat surface.
Step 12. If there is any old thermal grease on the four GPUs, gently clean the top of the four GPUs with an
alcohol cleaning pad.
After you finish
ThinkSystem SR670 V2 Maintenance Manual
288

Advertisement

Table of Contents
loading

This manual is also suitable for:

7z227z23

Table of Contents