Chassis installation time requirements

The following table lists procedures you use to install the Avaya Ethernet Routing Switch
8800/8600 chassis and the estimated time you need to complete each procedure. Not all
procedures are required for every Avaya Ethernet Routing Switch 8800/8600 system.
Table 7: Installation procedures and time requirements

Mounting the chassis in a two-post rack

Installing the cable management brackets
Grounding the chassis
Mounting the chassis in a two-post rack
Mount the 8010co chassis in a standard two-post equipment rack. To install the 8010co chassis
in a 23-in. equipment rack, see the adapter installation instructions provided by the rack
manufacturer.
Prerequisites
• To mount the 8010co chassis in a two-post rack, you need the following equipment:
- Installation shelf (shipped with the 8010co chassis)
- A standard 19-in. or 23-in. equipment rack
Attach the clip nuts shipped with the 8010co chassis, if necessary.
- 12 Phillips screws and a Phillips screwdriver
Procedure steps
1. Place the installation shelf at the bottom of the rack inside the rails.
2. Hold the installation shelf in position and align the mounting rail with the two holes
Installation — Chassis
Procedure
on each side of the vertical rack support.
Chassis installation time requirements
Time requirement
12–30 minutes
5 minutes
5 minutes
November 2012
57