Chassis installation time requirements

The following table lists procedures you must use to install the Avaya Ethernet Routing Switch
8300 chassis and the estimated time you need to complete each procedure. Not all procedures
are required for every Avaya Ethernet Routing Switch 8300 system.
Positioning the chassis on a flat surface
Mounting the chassis in an equipment rack
Installing the cable management brackets

Reducing the chassis weight

Reduce the chassis weight to make the chassis easier to lift, and thus you can reduce the risk
of personal injury or equipment damage. This procedure requires approximately 5 minutes to
complete.
Procedure steps
1. Remove the power supply filler panels.
2. Remove the module filler panels.
3. Remove the fan trays.
Installation — Chassis
on page 38
Procedure
For more information, see Avaya Ethernet Routing Switch 8300 Installation — AC
Power Supply, NN46200-301.
For more information, see Avaya Ethernet Routing Switch 8300 Installation —
Modules, NN46200-305.
For more information see Avaya Ethernet Routing Switch 8300 Installation — Fan
Tray, NN46200-302.
Chassis installation time requirements
Time requirement
5 minutes
9–17 minutes depending on the chassis
5 minutes
on
May 2011
33