Avaya 8800 Installation Manual page 67

Ethernet routing switch chassis installation
Table of Contents

Advertisement

Table 9: Item description for chassis and AC power supply grounding
Item
1
2
3
4
5
6
7
8
Installation — Chassis
Cabinet frame or equipment rack
Upper shelf chassis ground stud
Upper shelf ground leads (not provided)
AC equipment ground (ACEG) leads within individual lower shelf cords
(x 3)
Single-point ground system
AWG 6 ground lead (not provided)
Rack ground strip (example only)
AC equipment ground (ACEG) leads within individual upper shelf cords
(x 3)
Description
Grounding the chassis
November 2012
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

86008010co801080068003-r

Table of Contents