Avaya 8800 Installation Manual page 58

Ethernet routing switch chassis installation
Table of Contents

Advertisement

8010co chassis installation
3. Insert a Phillips screw through each installation shelf mounting hole and into the
4. Add a hex nut to each screw and tighten by using a hex wrench.
5. Tighten each screw with a Phillips screwdriver.
6. If the holes in the vertical supports require clip nuts, insert a clip nut in each of the
7. Lift the 8010co chassis onto the installation shelf.
8. Hold the 8010co chassis in position and align the flanged end of the chassis
58
Installation — Chassis
corresponding hole in the rack.
For more information about installing the shelf, see
installation shelf in a 19-in. equipment rack
Figure 30: Installing the installation shelf in a 19-in. equipment rack
12 locations.
Warning:
Risk of personal injury
It requires three people to lift the 8010co chassis. To make the chassis lighter,
remove the modules and power supplies before you lift it.
mounting rail with the six holes on either side of the vertical rack support.
For more information about installing the chassis, see
8010co chassis in a 19-in. two-post rack
Comments? infodev@avaya.com
Figure 30: Installing the
on page 58.
Figure 31: Installing the
on page 59.
November 2012

Advertisement

Table of Contents
loading

This manual is also suitable for:

86008010co801080068003-r

Table of Contents