Check Valve; High Pressure Switch (Hps) - Daikin LXE10E-A14 Service Manual

Marine type container refrigeration unit
Table of Contents

Advertisement

https://daikin-p.ru

4.1.10 Check valve

G Model LCV(B)5
(1) Replacement procedure
q Remove the pipe clamp which fixes the
check valve, then heat up the valve to
disconnect the brazed joint.
w Install the new check valve taking care to
install it in the correct direction, which is the
same direction as the arrow shown in the
label.
e Conduct brazing while cool the center part of
valve with a wet cloth to keep the
temperature of the valve body below 120 ˚C
(248˚ F)
r After replacing the valve, carry out refrigerant
leakage check, and make sure that there are
no leaks.
Compressor
Check valve
4.1.11 High-pressure switch (HPS)
G Model ACB-KB15
G Set point OFF : 2400kPa (24.47kg/cm
(1) Replacement procedure
q Disconnect the lead wire from the control
w In order to prevent refrigerant from flowing
e Remove the flare nut B and mounting
r Replace the HPS. After tightening the flare
Suction
t After tightening A , slightly loosen the flare
modulation
valve
y After replacing carry out the refrigerant
H
P
T
Discharge
pressure
regulating valve
Disconnect flare
nut here
4-9
ON
: 1900kPa (19.37kg/cm
When the refrigeration pressure of the unit
rises abnormally, the compressor stops for
safety. The HPS will be activated when the
pressure exceeds the set point, as a result of
trouble with the condenser fan.
box.
out, disconnect the high-pressure gauge
piping from the gauge joint (with check valve)
A on the compressor side.
screws of HPS on the casing at the left side
of the compressor.
nut B , tighten the flare nut A .
nut B , remove air, and retighten B .
leakage check, and make sure that there are
no leaks.
H
P
B
S
A
C O M P R E S S O R
)
2
)
2
L
Disconnect flare
nut here
C
L P T

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lxe10e-a15

Table of Contents