Fujitsu Airstage J-II Series Design & Technical Manual page 408

Small vrf system
Table of Contents

Advertisement

z Installation method
Refer to an installation manual for the details.
Power supply cable
Switch box
Hole in wall
Installation plate
Power supply
cable
Screw
Washer
Screw
Touch pen tray
(a) Lan cable
(b) Lan terminal
(c) CF card
Case of UTY-DTGYZ1
CAUTION: In advance install a switchbox to the wall where the touch panel
controller is to be installed.
z The diagram of the mounting plate screw hole positions
CAUTION: Refer to the mounting screw hole positions of the switchbox that
is to be installed in advance and check the compatibility.
Transmission
cable
LAN cable
Transmission
cable
Cable tie
Harness
Connection cable
Rear view
(a)
(b) (c)
8-5/16 (211)
7-1/2 (190)
7-1/16 (180)
3/8 (10)
3-9/16 (90)
5-9/16 (142)
2-1/4 (56.7)
2-15/16 (74.2)
7-7/16 (189)
- (05 - 45) -
power supply cable
Switch box
Hole in wall
Installation plate
power supply
cable
Screw
Washer
Screw
Cable tie
Touch pen tray
Connection cable
Case of UTY-DTGY
Unit : in. (mm)
Transmission
cable
Transmission
cable
Cable tie
Harness

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage aou36rlavmAirstage aou48rlavmAirstage aou60rlavmAirstage auua4tlav1Airstage auua7tlavAirstage auua9tlav ... Show all

Table of Contents