Powerware Plus 80 Operation page 159

Table of Contents

Advertisement

A
air circulation, allowing for, 6
requirements. 6
ambient temperature, recommended. 6
battery
conductors, A-3
disconnect switch, A-3
voltage and current, A-3
wiring, A-3
battery
cabinets
Type 1 ,cabinet
illustration, 29
line-up-and-match instaflation,
preparing for stand-alone instailatfon. 30
stand-alone installation, 36
wiring (illustration). 31
UPS. 33
wiring line-up-and-matoh cabinets
together 33
wiring stand-alone cabinets to the UPS, 32
wiring stand-afone cabinets together, 30
Type 2 cabinet
illustration, 34
line-up-and-match instaffation.
preparing for stand-alone installation, 36
stand-aione instaflation. 36
wiring (illustration), 36
wiring line-up-and-match cabinets to the
UPS, 36
together, 36
wiring stand-akxte cabinets togemer, 36
notes. 26
joining to other battery cabinets, 21,26
joining to me UPS, 21, 22
preparing the UPS cabinet. 17
tilting, 26
C
cabinet to cabinet grounding, 26
cabinets
damaged, 0
tilting, A-3
unpacking, 7
ventilation requirements, A-3
caster assemblies
bolting to cabinet, 16
damaged, 16
installing, 14.
sliding into place, 16
codes, eleotrfcaf, A-2
conduit landing plates, 12
control wiring
for options and aocessorles,
installing, A-4
33
cooling, cabinet, 6
customer support, 3
environmental
equipment weight, 6
external overcurrent protectfon. A-6
external wiring requirements, A-2
36
humidity, recommended maximum, 6
I
input transformer cabinet
illustration, 39
installing, 39
joining to the UPS, 21, 22
preparing for wiring to UPS, 40
preparing the UPS cabinet for, 19
1.5
A-4
requirements,
6
A-3
points to UPS, 40
Plus 60 UPS Operator's Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents