Roll the UPS into its final operating position and secure it with its leveling feet.
2. Roll the PDM cabinet to the left of the UPS. Join the two cabinets using the
appropriate method described in "Joining Cabinets" on page 11.
I
Set the deadfronts and screws aside for remounting later.
I
4. Use three bolts and three nuts from the hardware joining kti to secure the front
of the transformer cabinet to the front of the UPS cabinet at the points shown in
I
Figure 25 on page 43. (See 'Joining an Optional Cabinet to the UPS" on page
22.)
I
the procedure on page 26.
6.
To wfre the PDM cabinet to the UPS:
1.
Cables for interconnecting the PDM to the UPS are coiled and tie-wrapped in
I
place inside the PDM cabinet The connections inside the transformer cabinet
are already made. Locate the coil of cables inside the PDM cabinet.
I
2. Cut the tie-wraps around
marked with its designation point in the UPS cabinet.
I
3. Connect the cables according to input voltage as shown in in Table C:
I
I
I
I
4 4
PDM
Secure the PDM cabinet with its front leveling feet
Table C. PDM to UPS Connection Pointe
Distribution Panet (2 cables) 0A
Distribution Panel (2 cables) N
Distribution Panel (2 cables) G
cabinet. Remove the top and bottom deadfronts.
me
cables, and uncoil the cables. Each cable is
point in UPS
El2
Customer ground