Avaya DEFINITY Installation And Test page 104

Wireless business system
Hide thumbs Also See for DEFINITY:
Table of Contents

Advertisement

DWBS Installation Checklist
Checklist
The following table is a checklist of tasks for completing a DWBS installation.
Where appropriate, references to the corresponding pages for a description of the
tasks indicated are also provided. Unless otherwise indicated, the page
references are for the DWBS Installation document.
Table A-1. Checklist of Tasks and Corresponding Description Page References for
Completing a DWBS Installation
Task: Have you...
Wired the CAUs according to the SDSC installation
plan?
Wired the WFBs according to the SDSC installation
plan?
Installed and wired the power supplies for each WFB
that has an attached CAU?
Verified that the DC power leads for WFB are
"doubled up?"
Placed the TN789 circuit packs into the appropriate
slots?
Terminated WFBs 1A and 1B to ports 1 and 2 of the
first TN789 circuit pack?
Terminated WFBs 2A and 2B to ports 1 and 2 of the
second TN789 circuit pack?
Terminated all remaining WFBs properly?
Installed the WT download cable?
Upgraded the switch software to V5 or greater?
Enabled wireless capabilities via the Optional
Features form by entering the change
system-parameters customer-options command?
(Remember to log off and log on again.)
Enabled wireless capabilities via the
Wireless-Related System-Parameters form by
entering the change system-parameters wireless
command?
Administered the Carrier-Frequencies form?
Administered RC download permissions via page 2 of
the Features-Related System-Parameters form by
entering the change system-parameters features
command?
A-2
Issue 6 September 2001
Page
3-30
3-20
3-21
3-13
3-11
3-10
3-10
3-10
4-7
2-1
2-2
2-3
2-9
8-9 (Maintenance)
Yes/No

Advertisement

Table of Contents
loading

Table of Contents