Juniper E Series Hardware Manual page 165

Routing platforms
Hide thumbs Also See for E Series:
Table of Contents

Advertisement

To pack the chassis for shipment, follow these steps:
Ground yourself by using an antistatic wrist strap or other device.
1.
Issue the proper shutdown commands to halt your system.
2.
Switch all power switches to the OFF position.
3.
Remove all cables from the chassis.
4.
Remove all major components from the chassis, including line modules, I/O
5.
modules, fan trays, and cable management systems.
Remove the chassis from the rack and bolt it to the shipping pallet.
6.
Cover the chassis with an ESD bag and place packing foam on top of and
7.
around the chassis.
Place the crate cover over the chassis and fasten the cover to the pallet.
8.
Returning Products for Repair or Replacement
Customer Support
149

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents