Hoshizaki IM-240DME Service Manual page 85

Stackable cuber
Hide thumbs Also See for IM-240DME:
Table of Contents

Advertisement

6) Cut off the Capillary Tubes of the Valve and High-pressure Switch, using a file and pliers.
6) Cut off the Capillary Tubes of the Valve and High-pressure Switch, using a file and pliers.
Be careful not to damage the Capillary Tube end.
Be careful not to damage the Capillary Tube end.
7) Disconnect the flare connections from the Bracket.
7) Disconnect the flare connections from the Bracket.
8) Remove the screws and the valve from the Bracket.
8) Remove the screws and the valve from the Bracket.
9) Install the new valve, and insert the Capillary Tubes into the Copper Tube.
9) Install the new valve, and insert the Capillary Tubes into the Copper Tube.
10) Web the Copper Tube end, and braze or solder the Copper Tube and Capillary Tubes
10) Web the Copper Tube end, and braze or solder the Copper Tube and Capillary Tubes
together.
together.
11) Install the new Drier (See "3. DRIER").
11) Install the new Drier (See "3. DRIER").
12) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
12) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
13) Evacuate the system and charge it with refrigerant (See "1. [c] EVACUATION AND
13) Evacuate the system and charge it with refrigerant (See "1. [c] EVACUATION AND
RECHARGE").
RECHARGE").
14) Connect the flare connections.
14) Connect the flare connections.
15) Open the water supply tap.
15) Open the water supply tap.
16) Check for water leaks.
16) Check for water leaks.
17) Replace the panels in their correct positions.
17) Replace the panels in their correct positions.
18) Plug in the icemaker or connect the power source.
18) Plug in the icemaker or connect the power source.
E1CG4880210
E1CG4880210
Valve Body
Valve Body
Flare
Flare
Connection
Connection
Capillary Tube
Capillary Tube
Fig. 51
Fig. 51
Adjust Screw
Adjust Screw
Bellows
Bellows
81
81

Advertisement

Table of Contents
loading

Table of Contents