Test The Drive Speed - Stowed Position; Test The Drive Speed - Raised Or Extended Position - Genie S-40 Service Manual

Serial number range from s40-7001 to s4012-17231
Hide thumbs Also See for S-40:
Table of Contents

Advertisement

October 2013
B-18
Test the Drive Speed -
Stowed Position
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper drive function movement is essential to
safe machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
Note: Select a test area that is firm, level and free
of obstructions.
1 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2 Start the engine from the platform controls.
3 Move the engine idle control switch to
foot switch activated high idle (rabbit and foot
switch symbol), then lower the boom into the
stowed position.
4 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
5 Bring the machine to top drive speed before
reaching the start line. Begin timing when your
reference point on the machine crosses the
start line.
6 Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Section 2, Specifications.
Part No. 102521
Section 3 • Scheduled Maintenance Procedures
B-19
Test the Drive Speed -
Raised or Extended Position
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper drive function movement is essential to
safe machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
Note: Select a test area that is firm, level and free
of obstructions.
1 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2 Start the engine from the platform controls.
3 Move the engine idle select switch to foot switch
activated high idle (rabbit and foot switch
symbol).
4 Raise the boom above horizontal.
5 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
S-40 • S-45
CHECKLIST B PROCEDURES
3 - 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-45

Table of Contents