Installing The Optional Units; Installing The Bridge Unit; Installation Space - Epson WF-C20590 Installation Manual

Hide thumbs Also See for WF-C20590:
Table of Contents

Advertisement

WF-C20590 Installation Guide

Installing the Optional Units

Installing the Bridge Unit

Be sure to check the following notes before the installation:
 All workers must read the installation procedure together
before starting work.
 Wear easy-to-move clothing, gloves, and safety shoes.
 Work with care to avoid injuries.
 Work with sufficient working space.
 Use proper lifting techniques, and stop working
immediately if you feel that the load is too bulky or heavy.
 Minimum workers
 1 person
 Items needed
 Phillips screwdriver
 Flathead screwdriver
 Wrench (included in the Bridge Unit box)
 Joint parts (included in the Bridge Unit box)
After connecting the Bridge Unit to the printer, you can store the
C H E C K
P O I N T
parts below inside the Finisher Unit.
EJ Cover, Lower

INSTALLATION SPACE

You will need to adjust the height of the Bridge Unit with the casters on the
bottom of the unit. Allow at least 19.7 inches (500 mm) between the rear of the
printer and the wall where the unit will be installed.
PRELIMINARY
Installing the Optional Units
EJ Stacker
19.7 in (500 mm)
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents