Engines; Timing Adjustment; Rpm Adjustment; Engine Drive Pulley - Genie Z-45 Service And Repair Manual

Electric and bi-energy power articulating boom lifts
Hide thumbs Also See for Z-45:
Table of Contents

Advertisement

Service and Repair Manual

Engines

6-1

Timing Adjustment

Complete information to perform this procedure is
available in the Kubota Z482-E2B Workshop
Manual (Kubota part number 97897-01165).
Kubota Z482-E3B Operator's Manual (Kubota part
number 1G689-89160).
Kubota Z482-E2B Workshop Manual
Genie part number
Kubota Z482-E3B Operator's Manual
Genie part number
6-2

RPM Adjustment

Refer to Maintenance Procedure in the appropriate
Service or Maintenance Manual for your machine,
Check and Adjust the Engine RPM.
40
52956
139420
Z®-45/25 Bi-Energy • Z®-45/25J Bi-Energy
6-3

Engine Drive Pulley

How to R emove the Engi ne Drive Pulley
How to Remove the Engine Drive
Pulley
1
Remove the engine pivot plate latch retainer.
2
Open the engine pivot plate latch and swing
the engine out away from the machine to
access the engine drive pulley.
3
Loosen the tension adjustment bolt on the
generator.
4
Pull the generator away from the machine and
remove the belts from the generator pulley.
5
Remove the 3 bolts that attach the engine
drive pulley to the shaft bushing.
6
Install the same 3 bolts that were removed in
step 5 into the threaded holes of the engine
drive pulley.
September 2016
Part No. 1268546GT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-25Z-45jZ-25j

Table of Contents