September - Genie Z-45 Service And Repair Manual

Electric and bi-energy power articulating boom lifts
Hide thumbs Also See for Z-45:
Table of Contents

Advertisement

Service and Repair Manual
Specifications
3
Working clockwise on the body hex fitting,
make a second mark with a permanent ink
marker to indicate the proper tightening
position. Refer to Illustration 2.
Note: Use the JIC 37° Fitting table in this section to
determine the correct number of flats, for the
proper tightening position.
Note: The marks indicate the correct tightening
positions have been determined. Use the second
mark on the body hex fitting to properly tighten the
joint after it has been loosened.
Illustration 2
1 body hex fitting
2 reference mark
3 second mark
4
Tighten the hex nut until the mark on the hex
nut is aligned with the second mark on the
body hex fitting.
5
Operate all machine functions and inspect the
hose, fittings and related components to
confirm there are no leaks.
10
Z®-45/25 Bi-Energy • Z®-45/25J Bi-Energy

September 2016

Part No. 1268546GT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-25Z-45jZ-25j

Table of Contents