ABB ETL600 Instruction Manual page 358

Digital power line carrier system
Table of Contents

Advertisement

ETL600 Commissioning Report
Test
No.
Test procedure
C.13
V.24 ports
C.13.1
V.24 Port 1
BER test
C.13.2
V.24 Port 2
BER test
C.13.3
V.24 Port 3
BER test
C.13.4
V.24 Port 4
BER test
C.13.5
V.24 Port 5
BER test
C.13.6
V.24 Port 6
BER test
C.14
Documentation
If possible, take printout
of Configuration data for
reference.
Save the 'et6' file on
disk with Serial No. of
ETL coded in the file
name, e.g.
'HE400327C.et6'.
C.15
Manual reset
© ABB Switzerland Ltd
Revision:
Language:
EN
Test point
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 1
during ____ sec
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 2
during ____ sec
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 3
during ____ sec
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 4
during ____ sec
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 5
during ____ sec
Front plate P4LT/P4LU
BER ≤ 10
V.24 PORT 6
during ____ sec
Company:
_________________________________
Department:
_________________________________
Date:
_________________________________
Signed:
_________________________________
Visa:
_________________________________
Page:
HE
C10/C10
Permissible
value
Units
-5
-5
-5
-5
-5
-5
Test
result
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
Form 1KHw001495-EN
Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents