ETL600 Commissioning Report
Test
No.
Test procedure
Tune hybrid P3LE
C.6.4
RF Coaxial cable to be connected.
Dialog box: Tune RF hybrid
Press 'Start measurement' & adjust
the balancing network (Resistance
with jumper RA/RB/RC/RD/RP and
potentiometer R226, inductance with
jumper LA – LN/LP and capacitance
with jumpers CA to CL, CP)
C.6.5
SNR pilot
Upload status data of local
equipment
SNR pilot
C.7
Equalization
C.7.1
Measure frequency response
In menu Equipment / Commissioning
and maintenance / Frequency
response / APLC channel 1, APLC
channel 2 or APLC channel 3
C.7.2
Select Equalizer
In menu Equipment / Commissioning
and maintenance / Select equalizer /
APLC channel 1, APLC channel 2 or
APLC channel 3
C.8
R1BC, if present
Activate alarms as programmed on
R1BC.
Deactivate alarms as programmed
on R1BC.
C.9
Configure Real time Clock (RTC)
C.9.1
Setting real time clock
Menu: Equipment, Commissioning
and maintenance, Eventrecorder, Set
clock
Download date/time to RTC
2
The tuning is not necessary when the ETL600 is operated without Rx filter P4RX.
© ABB Switzerland Ltd
Revision:
2
Dialog box
HMI600
HMI600
HMI600
Corresponding N/C
contacts on R1BC.
Corresponding N/C
contacts on R1BC.
Dialog box
Language:
Page:
EN
C3/C10
Permissible
Test point
value
Till minimum is
read by HMI.
> 15
Closed
Open
Actual time and
date
HE
Test
Units
result
[ ]
Ch 1 Ch 2 Ch 3
dB
[ ] [ ] [ ]
Ch 1 Ch 2 Ch 3
[ ] [ ] [ ]
Ch 1 Ch 2 Ch 3
[ ] [ ] [ ]
[ ]
[ ]
[ ]
[ ]
Form 1KHw001495-EN
Rev. A