Removal Of Pcb - Daikin FTXL20G2V1B Service Manual

Heat pump/indoor/outdoor units, inverter pair wall mounted type g-series
Hide thumbs Also See for FTXL20G2V1B:
Table of Contents

Advertisement

Outdoor Unit - RXL35G2V1B
5.4

Removal of PCB

Procedure
Step
1
Remove the cover of
the electrical box.
2
Disconnect the
connectors from the
service monitor PCB
[S52] [S102].
3
Detach the 4 clamps
with pliers.
4
Remove the screws of
the terminal board and
the earth wire.
254
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
[S102]
[S52]
Service monitor PCB
Clamps
Terminal board
Preparation
„ Remove the electrical box
(R9405)
(R5280)
(R5281)
Earth wire
(R12285)
SiENBE04-925_A
Points
according to the "Removal of
Electrical Box".
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents