Download Print this page

Removal Of The Pcb - Daikin FVKS25BAVMB Service Manual

Removal procedure, 2.5/3.5 kw class
Hide thumbs Also See for FVKS25BAVMB:

Advertisement

Si06-763

4. Removal of the PCB

Procedure
Step
1
Loosen the fixing screw
to remove PCBs from
the electrical box.
The figure shows the
2
control PCB (indoor
unit).
Removal Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Power supply PCB
Service
PCB
Control PCB
(R2625)
S6
S23
S21
S203
Operation lamp Timer lamp
LED11 LED12 LED14
Green Yellow
Main unit
ON/OFF
switch
SW1
S25
S302
S32
S31
S7
Removal of the PCB
Points
Display PCB
Home Leave
Operation lamp
Red
Signal receiving section
(R2626)
S301
S201
(R2627)
9

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Fvxs25bavmbFvks35bavmbFvxs35bavmb