Main Circuit Short Check - Daikin FTXL20G2V1B Service Manual

Heat pump/indoor/outdoor units, inverter pair wall mounted type g-series
Hide thumbs Also See for FTXL20G2V1B:
Table of Contents

Advertisement

SiENBE04-925_A

5.1.13 Main Circuit Short Check

Check No.29
Note:
Check to make sure that the voltage between (+) and (–) of the diode bridge (DB1) is approx.
0 V before checking.
„ Measure the resistance between the pins of the DB1 as below.
„ If the resistance is ∞ or less than 1 kΩ, short circuit occurs on the main circuit.
(–) terminal of the tester
(in case of digital,
(+) terminal)
(+) terminal of the tester
(in case of digital,
(–) terminal)
Resistance in OK
Resistance in NG
20 class
25 class
Service Diagnosis
~
+
(2, 3)
(4)
+
~
(4)
(2, 3)
several kΩ
~ several MΩ
0 Ω or
0
Check
~
(1)
(2, 3)
~
(1)
(2, 3)
several kΩ
~ several MΩ
0 Ω or
0
1
Tester
2
3
4
(R12035)
1
Tester
2
3
4
(R12266)
125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents