Furuno FEA-2107-BB Installation Manual page 17

Electronic chart display and information system (ecdis)
Hide thumbs Also See for FEA-2107-BB:
Table of Contents

Advertisement

To change the cable entry
To change the cable entry from the side (default) to the bottom, modify the unit as shown
below.
Screw M3X8
(Torque 0.78Nm)
3. Pass the cable from this hole.
4. In here, clamp the copper part
of the cable with the cable
clamp removed at step1.
(Torque 1.47Nm)
J522: If you connect RCU-016 in series with RCU-015FEA, plug in here.
RCU-015FEA/RCU-016, Changing cable entry
Bottom of the unit
2. Pull out the cable.
Cable clamp
03-163-7804
Screw M4X8
(Torque 1.47Nm)
1. Remove the
cable clamp.
1. MOUNTING
1-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fea-2807Fea-2107Fea-2107-dFea-2807-d

Table of Contents