Cisco RFGW-10 Hardware Installation Manual page 62

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Electrical Safety
Follow these basic guidelines when you are working with any electrical equipment:
Before beginning any procedures requiring access to the chassis interior, locate the emergency
power-off switch for the room in which you are working.
Disconnect all power and external cables before installing or removing a chassis.
Do not work alone when potentially hazardous conditions exist.
Never assume that power has been disconnected from a circuit; always check.
Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.
Never install equipment that appears damaged.
Carefully examine your work area for possible hazards such as moist floors, ungrounded power
extension cables, and missing safety grounds.
In addition, use the guidelines that follow when working with any equipment that is disconnected from
a power source but is still connected to telephone wiring or other network cabling.
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed for wet
locations.
Never touch un-insulated telephone wires or terminals unless the telephone line has been
disconnected at the network interface.
Use caution when installing or modifying telephone lines.
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Warning
Statement 1001
Cisco RF Gateway 10 Hardware Installation Guide
2-16
Chapter 2
Preparing Your Site for Installation
OL-16264-04

Advertisement

Table of Contents
loading

Table of Contents