Cisco RFGW-10 Hardware Installation Manual page 138

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Installation and Removal of the SFP Modules
Step 1
Close the bale clasp in the upward direction before inserting the SFP module.
Step 2
Line up the SFP module with the port and slide it into the port (see
Figure 5-24
To remove a bale clasp SFP module from a switching module port, perform the following steps:
Step 1
Open the bale clasp on the SFP module: With your index finger, press the clasp downward as shown in
Figure
flat-blade screwdriver or other long, narrow instrument to open the bale clasp as shown in
Step 2
Grasp the SFP module between your thumb and index finger and carefully remove it from the switching
module port as shown in
Cisco RF Gateway 10 Hardware Installation Guide
5-32
Inserting a Bale Clasp SFP Module into a Switching Module Port
W S - 4
4 4 8 - G
B - L X
1
3
2
4
2
5-25. If the bale clasp is obstructed and you cannot use your index finger to open it, use a small,
Figure
5-25.
5
7
6
8
4
6
8
Chapter 5
Installing and Removing FRUs
Figure
5-24).
OL-16264-04
Figure
5-26.

Advertisement

Table of Contents
loading

Table of Contents