Cisco RFGW-10 Hardware Installation Manual page 117

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 5
Installing and Removing FRUs
Installation and Removal of the Supervisor Cards
Figure 5-3
Supervisor Slot Locations In the Cisco RFGW-10 Chassis
1
1
Two supervisor slots
Step 5
To install a Supervisor Card, turn the module sideways with the board facing right, grasp the switching
module front panel with one hand and place your other hand under the board's side edge to support the
Supervisor Card as shown in
Figure
5-4. Do not touch the printed circuit boards or the connector pins.
Cisco RF Gateway 10 Hardware Installation Guide
5-11
OL-16264-04

Advertisement

Table of Contents
loading

Table of Contents