Fluke 9190A Operator's Manual page 91

Ultra-cool drywell field metrology well
Table of Contents

Advertisement

Secondary PRT (30 mm)
Primary PRT (0 mm)
Test Sleeve Insert
Connect both PRTs to the readout. It is best to make simultaneous measurements of both
the primary and secondary PRT when PRT data is measured from the readout. If the
readout only has one input channel, take the primary PRT readings back to back with the
secondary PRT without delay.
A remote connection to the product is required to complete this procedure. Use the
instructions in Chapter 3 "Remote Operation" to set up the remote connection to the
UUT.
To Readout (see "Suggested Equipment" in Table 4-2)
Figure 4-2. Test Sleeve Orientation
Calibration
Temperature Source Calibration
gzs052.eps
4
4-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents