Calibrator Setup

Unpack and Inspect

Unpack the instrument carefully and examine it for any damage that could have occurred
during shipment. If there is shipping damage, notify the Fluke Calibration and the carrier
immediately. Table 2-6 lists the equipment and the accessories that comes with the
Calibrator. Verify that all the equipment and accessories in Table 2-6 are in the box.
9190-INSX Insert (X=A, B, C, D, E, or F)
2-meter (6-foot) Mains Power Cord
USB Cable
Getting Started Manual
Product CD that contains manuals and remote interface driver files
9930 Interface-it Calibration Software and Users Guide
Report of Calibration and Calibration Label
Well Insulator Cap
Insert Removal Tool
Clamp-on Ferrites (-P model only)
6-pin DIN Connector (-P model only)
Test Lead Kit (-P model only)

Placement

Put the Calibrator on a clean, flat surface. Make sure the Calibrator is 150 mm (6 inches)
away from all objects. For best results, choose a location to set up the Product where
room temperature changes are minimum.
To prevent possible fire or personal injury:
2-8
Table 2-6. Parts and Accessories
Name
Do not operate Product in orientations other than upright. A
fire hazard can be made if the Product is put on its side.
Do not remove Inserts when the Product shows
temperatures more than 50 °C.
Do not operate near flammable materials.
Do not touch the well access surface of the Product.
Do not turn off the Product when the temperature is above
100 °C. Set a SETPOINT temperature below 100 °C and let
the Product cool.
 Warning
Quantity
1
1
1
1
1
1
1
1
1
4
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents