Power And Remote Interface Panel; Startup And Main Screen - Fluke 9190A Operator's Manual

Ultra-cool drywell field metrology well
Table of Contents

Advertisement

9190A
Operators Manual

Power and Remote Interface Panel

Table 2-4 shows and describes the connectors and ports on the Power and Remote
Interface Panel.
4
Item
Mains Power Cord
Receptacle
Power Switch
9-pin Subminiature
Serial Connector (RS-232)
USB Serial Connector
Fuse

Startup and Main Screen

When the Calibrator turns on, the system initializes, does a self-check, then shows a
startup screen that shows the model number and firmware version information. If the self-
check finds an error, the error is shown on the Startup screen. Contact Fluke Calibration
if an error shows on the Startup screen.
After the start-up initialization is complete, the Startup screen disappears and the Main
screen shows on the display. Table 2-4 shows and describes the indicators on the Main
screen.
2-6
Table 2-4. Power and Remote Interface Panel
3
Name
Receptacle for the mains power cord. Use an AC mains supply
appropriate for the voltage range and region of use.
Turn on (I) and turn off (O) the Calibrator.
Transmits measurements and remotely controls the operation of
the instrument. See Chapter 3, "Remote Operation".
Transmits measurements and remotely controls the operation of
the instrument. See Chapter 3, "Remote Operation".
Product fuse. See Chapter 4 for fuse replacement instructions.
1
Function
2
5
gzs004.eps

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents