Pre-Delivery Preparation Report - Genie AWP Super Series Service Manual

Hide thumbs Also See for AWP Super Series:
Table of Contents

Advertisement

September 2016
Pre-Deliv ery Prepar ati on Repor t
Fundamentals
It is the responsibility of the owner or dealer to
perform the Pre-delivery Preparation.
The Pre-delivery Preparation is performed prior to
each delivery. The inspection is designed to
discover if anything is apparently wrong with a
machine before it is put into service.
A damaged or modified machine must never be
used. If damage or any variation from factory
delivered condition is discovered, the machine
must be tagged and removed from service.
Repairs to the machine may only be made by a
qualified service technician, according to the
manufacturer's specifications.
Scheduled maintenance inspections shall be
performed by qualified service technicians,
according to the manufacturer's specifications and
the requirements listed in the responsibilities
manual.

Pre-Delivery Preparation Report

Instructions
Use the operator's manual on your machine.
The Pre-delivery Preparation consists of
completing the Pre-operation Inspection, the
Maintenance items and the Function Tests.
Use this form to record the results. Place a check in
the appropriate box after each part is completed.
Follow the instructions in the operator's manual.
If any inspection receives an N, remove the
machine from service, repair and re-inspect it. After
repair, place a check in the R box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Comments
Pre-delivery Preparation
Pre-operation inspection completed
Maintenance items completed
Function tests completed
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Service Manual
Y
N
R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iwp super series

Table of Contents