Platform Control Box - Genie AWP Super Series Service Manual

Hide thumbs Also See for AWP Super Series:
Table of Contents

Advertisement

Service Manual
Platform
7-2 Platform Contr ol Box
7-2

Platform Control Box

How to Test the Contacts
1
Fully lower the platform.
2
Turn the key switch off and disconnect the
power supply.
3
Remove the platform control box cover
fasteners and open the control box.
4
Note the markings on the contact to be tested.
N.O. designates the contact as normally open.
N.C. designates the contact as normally
closed.
5
Connect a continuity tester to the exposed
screw terminal.
Result: Normally open contacts should read
no continuity. Normally closed contacts should
read continuity.
6
Push the small triangular button on the top of
the contactor.
Result: Normally open contactor should read
continuity. Normally closed contacts should
read no continuity.
104
How to Test Power to Platform
GFCI Outlet
1
2
3
4
5
6
7
AWP Super Series • IWP Super Series
Fully lower the platform.
Turn the key switch off and remove the key.
AC and DC models: Be sure the AC power
supply is properly connected.
Connect a volt meter or a small electric
powered tool to the platform GFCI receptacle.
Confirm the voltage or test the electric
powered tools operation.
Result: The voltage should be 115V AC
nominal or the electric powered tool should
operate normally.
Push the black TEST button on the GFCI
receptacle.
Result: The voltage should be 0V or the
electric powered tool should not operate.
Push the red RESET button on the GFCI
receptacle.
Result: The voltage should be 115V AC
nominal or the hand tool should operate
normally.
September 2016
Part No. 38139

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iwp super series

Table of Contents